write a program to draw a right-justified triangle given the height as input. the first row has one asterisk (*) and increases by one for each row. each asterisk is followed by a blank space and each row ends with a newline.

Answers

Answer 1

Here's a program to draw a right-justified triangle with height as input:

height = int(input("Enter height of triangle: "))

for i in range(height):

   print(" "*(height-i-1) + "*"*(i+1))

In the above program, we first take the height of the triangle as input from the user. Then, we use a for loop to iterate through each row of the triangle.

In each iteration, we print a number of blank spaces to right-justify the asterisks. The number of blank spaces is equal to the difference between the height of the triangle and the current row number, minus one.

After printing the blank spaces, we print a number of asterisks equal to the current row number. Finally, we print a newline character to move to the next row.

For example, if the user enters a height of 5, the output will be:

   *

  **

 ***

****

*****

Learn more about programming:

https://brainly.com/question/26134656

#SPJ11

Write A Program To Draw A Right-justified Triangle Given The Height As Input. The First Row Has One Asterisk
Write A Program To Draw A Right-justified Triangle Given The Height As Input. The First Row Has One Asterisk

Related Questions

Conduit pip benders are best used with which of the following materials?


THHN wire

Non-metallic sheathed cable

Electrical metallic tubing

Rigid conduit

Answers

Conduit pipe benders are best used with electrical metallic tubing (EMT) and rigid conduit.

Why conduit pipe benders are best used with EMT and rigid conduit only?

These types of conduits are made of metal and require bending to fit around corners and obstacles in electrical installations.

THHN wire and non-metallic sheathed cable, on the other hand, are not typically bent using conduit pipe benders. THHN wire is typically run through conduit, but the conduit itself would be bent, not the wire. Non-metallic sheathed cable, also known as Romex, does not require conduit and is not typically bent during installation.

To learn more about rigid conduit, visit: https://brainly.com/question/30772913

#SPJ1

state which parties will be responsible for the following task in a construction of an earthfall dam for irrigation:
1.Providing labour.
2.Funding the construction of the dam. 3. Approving the drawings
4.Overall coordination of the project.
5.Setting up coordinates and levels for back-filling​

Answers

The parties in the construction of an earthfall dam for irrigation who will be responsible for the following services are given below.

What is the justification for the above response?

Providing labor: The responsibility for providing labor in the construction of an earthfill dam for irrigation will typically fall on the contractor or construction company that has been awarded the contract for the project. The contractor is usually responsible for hiring and managing all the necessary labor, including skilled and unskilled workers, to complete the construction of the dam.

Funding the construction of the dam: The responsibility for funding the construction of the earthfill dam will usually lie with the party or parties that have commissioned the project. In most cases, this will be a government agency or a private company that is investing in the construction of the dam.

Approving the drawings: The responsibility for approving the drawings for the earthfill dam will typically fall on the government agency or private company that is commissioning the project. The drawings will need to be approved by the relevant regulatory bodies and local authorities to ensure that the dam meets all the necessary safety and environmental standards.

Overall coordination of the project: The responsibility for the overall coordination of the project will usually fall on the project manager or project team that has been appointed by the commissioning party. The project manager will be responsible for overseeing all aspects of the project, including managing the budget, scheduling, and ensuring that the construction work is completed to the required standards.

Setting up coordinates and levels for back-filling: The responsibility for setting up the coordinates and levels for back-filling will typically fall on the engineering team that is responsible for the design and construction of the dam. The engineering team will be responsible for surveying the site and determining the best locations for the dam, as well as setting the appropriate coordinates and levels for the back-filling process.

Learn more about construction  at:

https://brainly.com/question/25795065

#SPJ1

Answer:

project manager

Explanation:

There are three car manufacturing factories A,B and C and they are producing the same type of cars.they are employing 1000,2000, and 3000 men and producing 10,15, and 25 cars per month respectively.find the labour productivity of each form and the production of each form per year

Answers

Answer:

  A: 0.010 cars/man·month, 120 cars/year

  B: 0.0075 cars/man·month, 180 cars/year

  C: 0.0083 cars/man·month, 300 cars/year

Explanation:

You have factories A, B, C employing 1000, 2000, 3000 men and producing 10, 15, 25 cars per month. You want to know the productivity and annual production of each factory.

Productivity

Productivity is output per input. In this case, the input is measured in man·months. The output is measured in cars.

  A: 10 cars/(1000 man·months) = 0.010 cars/man·month

  B: 15 cars/(2000 man·months) = 0.0075 cars/man·month

  C: 25 cars/(3000 man·months) ≈ 0.0083 cars/man·month

Production

The annual production rate is 12 times the monthly production rate, assuming each factory works 12 months per year.

  A: 10 cars/mo · 12 mo/yr = 120 cars/yr

  B: 15 cars/mo · 12 mo/yr = 180 cars/yr

  C: 25 cars/mo · 12 mo/yr = 300 cars/yr

build a 3-bit counter which counts in the following sequence: 0,5,2,7,4,1,6,0. when ce is high on the clock edge the current value of the counter advances to the next number in the counting sequence. so 0,5,2,7,4,1,6,0,5,2,7,4,1,6,0... is the sequence of states this counter will go through when ce is high. when ce is low the counter stays in the same state. you may use only 3 d flip-flops and logic gates. the counter's 3 output bits must come directly from the flip-flops. the counter should also have a tc output which is high at 6 (the last state before the sequence is repeated).

Answers

To create a 3-bit counter that counts in the sequence 0,5,2,7,4,1,6,0, you can use 3 D flip-flops and logic gates. The counter's 3 output bits should come directly from the flip-flops.

On the clock edge, when CE is high, the current value of the counter advances to the next number in the sequence. When CE is low, the counter stays in the same state. Additionally, the counter should have a TC output that is high at 6, which is the last state before the sequence is repeated.

To create this 3-bit counter, you would need to connect the Q outputs from the 3 flip-flops to the inputs of the logic gates. The logic gates would be responsible for generating the next state of the counter based on the current state. For example, when the current state is 0, the logic gates would generate the next state of 5.

Learn more about 3-bit counter

https://brainly.com/question/15564715

#SPJ11

Which of the following questions would be relevant to conducting a building's life-cycle assessment? (Select
all that apply.)

A. What is the cost of the building?
B. Will the building be operated by a foreign-owned corporation?
C. Will the building generate any pollution?
D. How long is the building expected to last?

Answers

The questions that would be relevant to conducting a building's life-cycle assessment? (Select all that apply.)

C. Will the building generate any pollution?

D. How long is the building expected to last?

Building's life-cycle assessment is a comprehensive evaluation of the environmental impacts of a building throughout its entire life cycle, including raw material extraction, transportation, construction, operation, maintenance, renovation, and demolition.

It aims to identify ways to reduce the building's environmental impact and promote sustainability. Relevant factors to consider in a building's life-cycle assessment may include energy efficiency, water usage, waste generation, greenhouse gas emissions, and the use of sustainable materials and practices. Additionally, the expected lifespan of the building is also a crucial factor to consider in the life-cycle assessment as it determines the overall environmental impact of the building over time.

To know more about construction visit:-

brainly.com/question/1888902

#SPJ1

3–109E A 0. 083-in-diameter electrical wire at 90°F is covered by 0. 02-in-thick plastic insulation (k = 0. 075 Btu/h·ft·°F). The wire is exposed to a medium at 50°F, with a combined convection and radiation heat transfer coefficient of 2. 5 Btu/h·ft2·°F. Determine if the plastic insulation on the wire will increase or decrease heat transfer from the wire. Answer: It helps

Answers

The heat transfer rate with insulation is significantly higher than the heat transfer rate without insulation, as can be shown by comparing the two heat transfer rates.

Which has the greatest rate of heat transfer?

The table shows that solids (s) generally conduct heat at rates that are significantly higher than those of liquids (l) and gases (g).

The following equation can be used to determine the heat transfer rate without insulation under the conditions of steady-state heat transmission and little heat generation in the wire:

A = pidL A = pi0.0831 = 0.26 square inches. Q = hA(T wire - T inf).

Q = 2.50.26(90 - 50) = 26 Btu/h without insulation R = 0.02 / (0.075×0.26) = 0.98 hrft2°F/Btu

Copper, which is frequently used for electrical cables, has a thermal conductivity of roughly 223 Btu/hft°F. Inputting the values provided yields:

R total = 1 / (2230.26pi×0.0832 / 4) = 0.14 hours/feet/degrees Fahrenheit/Btu

We obtain the following by substituting the above values: q with insulation = (90 - 50) / 0.14 = 286 Btu/h

To know more about heat transfer visit:-

https://brainly.com/question/30772526

#SPJ1

assume variables (a, b, c, and max) have been declared. in this code fragment of if and nested if statements, identify the error type as syntax or logic on each indicated code line. if(a > b) {

Answers

Here is the corrected code with comments explaining the changes made to address the syntax and logic errors:

if (a > b) {

   max = a;

} else {

   max = b; // max variable is now initialized or updated properly

}

if (a < 100) {

   if (b < 100) {

       System.out.printf("a and b are both greater than 100\n"); // corrected newline character inside double quotes

   }

}

a = 1; // set a to a positive integer to avoid division by zero error

c = b / a;

if (a == b) { // use double equal signs to compare a with b

   System.out.printf("a and b are equal\n");

}

// added closing curly brace for the outer if statement

The synthesis errors in the code fragment are:

Logic error: Max variable is not initialized or updated properly if a is not greater than b.Syntax error: curly brace is not closed for the inner if statement.Syntax error: missing closing curly brace for the outer if statement.Syntax error: newline character should be inside double quotes in the printf() statement.Logic error: division by zero will occur since a has been set to 0 before the calculation.Logic error: assignment should use double equal signs to compare a with b.Syntax error: missing closing curly brace for the outer if statement.

Learn more about programming:

https://brainly.com/question/26134656

#SPJ11

Question complete:

Assume variables (a,b,c, and max) have been declared. In this code fragment of if and nested if statements, identify the error type as syntax or logic on each indicated code line.

if (a>b)

{

Max=a;//1

}

if(a<100)

{

if (b<100)

{

System.out.printf("gna and b are both greater than1008n"); // \}

}

a=0;

c=b/a;//

if (a=b)

{

 System.out.printf("ona and b are equalzn");

a=a+1;

What are the advantages of regenerative cycle over simple Rankine cycle?

Answers

The regenerative Rankine cycle has a number of advantages over the simple Rankine cycle, such as Higher thermal efficiency, Lower exhaust, and Smaller physical size, Shorter startup time.

Higher thermal efficiency as the steam is recycled back to the boiler, resulting in higher efficiency and better fuel economy. Lower exhaust steam pressure and temperature, making it more suitable for applications with lower temperature differences between the heat source and the sink. Shorter startup time as the turbine does not require as much steam to reach operating conditions. Smaller physical size, as the high pressure and temperature equipment, is not necessary.

To learn more about  Rankine cycle :

https://brainly.com/question/17284733

#SPJ4

Other Questions
what is the common name of the following compound? acetone propanal propanone 1-propyl ketone 2-propyl ketone If a vehicle breaks down on the autobahn, the vehicle may be towed to which of the following?The next autobahn exit.The original destination on the autobahn, provided a tow bar is used.All choices are correct.The next gas station on the autobahn. Warren Harding's victory over Eugene Debs in the 1920 presidential electionindicated that:A. most Americans weren't interested in socialism and found it too extreme.B. a large number of Americans desired change and were upset with the status quo.C. third-party candidates had a good chance of winning an election in the United States.D. immigrant communities and urban workers were important voting blocs. Let x be a random variable distributed as normal(5,4). Find the probabilities of the following events: (i) p(x::; 6). (ii) p(x > 4 ). (iii) p( ix- 5 1 > 1 it is that a seen will prodce a plant Rafael spins the pointers of the top spinners shown at the right. Find the probability of each possible sum. Solve for Y3. The Mighty Drop ski slope has an angle of elevation of 75. If the top of the slope has an elevation of 800 feet, what is the length of the run?4. Little Judy let go of her red balloon. The balloon is now 2240 feet up in the air and 350 feet to the west. What is the angle of elevation when little Judy looks at her red balloon? Assignment 4: Divisible by Three need help pls pls plsss CAN SOMEONE HELP WITH THESE QUESTIONS? What does the use of the word submerged suggest in this excerpt? 80 POINTS!Please help!1) Starting from the sun, create a food chain including at least three organisms. Explain how energy is transferred through the chain.2)Describe one path carbon can take through the environment (through the systems and bodies of living things and back in our land, oceans, and atmosphere). Be sure to include at least five specific places that the carbon atom can be found as it makes its cycle. Analyze the text: Dark they were, and golden eyedWhy does the author have the settlers change their names using the old Martian names for landmarks? How does this affect the plot? Does Je veux un repas make sense ?Its supposed to mean I want a meal but Im not sure if it makes sense and if its the correct way to say it. 2.PWhen trying to determine whether triangles ABC and DEF are similar, Mae notices in the image that angles B and E are congruent. Next, she determines the ratio of BC to EF andobtains 3/5. What else does she need to do?A A453B53C E35 Evaluate x2 + 2(y w) for w = 2, x = 5, y = 8 Iodine 131 has a half life of 8 days. If you start with a sample of 100 grams, how much iodine 131 would be left after 10 days. (3 points) Please help, I cant figure this out! 22. You take out two loans totaling $5000: one from the bank at 8% interest and the other from your uncle at only 2% interest.a. How much did you borrow from the bank?b. What interest do you owe to your uncle?c. What interest do you owe the bank?d. What is the total interest that you owe?e. If the total interest is $300. Write a "total interest" equationf. How much did you borrow from each? Solve the equation.(X = how much you borrow from your uncle) THE BRIEF WONDROUS LIFE OF OSCAR WAO Who is Yunior? What are his essential traits? If you can answer it with another sheet answering all that I would appreciate it. This year, baldwin paid their workers $26. 81 per hour. How much will they be paying them 3 rounds from now